Product
YODO Asset World

An up-to-date 4D model of the site, from routine video

A model for sites in operation. We build the baseline once; after that, the video from your usual rounds keeps it current, finds what changed on each asset and measures the space.

How it works
  1. 01

    Walk your usual route with a 360° camera

    Upload the video as it is. Every asset in frame is placed on the baseline and matched to its ledger row; assets the ledger lacks come back as proposed rows.

  2. 02

    Each asset compared with the last round

    The route can differ every time; the same asset is found again by position and shape. Stains, rust and leaks are read from the images, moves, tilts and missing items in 3D.

  3. 03

    Changes go to work orders and the ledger

    Each change comes with a priority, photos and its 3D position, drafted as a CMMS work order, a ledger update or a line in the monthly report. A person approves each one.

Uses

One model for three kinds of site work

Maintenance

Each asset compared with its last round; wear and change go to the right team in order of priority.

Safety and fixed positions

Each round checks the site against how it should be: valve states, extinguisher positions, aisle widths, panel doors.

Space and capacity

Free floor and rack space totalled by zone from the walk video, for storage reports and layout plans.

Details

Unseen faces are marked

Each face of an asset records whether it was captured. A missed face shows its last image and date, and the next round is told where to film it from.

Your cameras, your systems

Capture with 360° cameras, phones or drones. Results go to your asset ledger, CMMS or digital twin.

Getting started

Start with one video

The first quick test is free: we run one of your videos and show the result before any payment. A PoC then follows in five steps. Your team films; we do the rest.

  1. 01Agree the use and the siteyou and Yodo
  2. 02Quick test with one video, freeYodo
  3. 03Baseline survey on siteYodo
  4. 04Connect the ledger and site dataYodo
  5. 05Run the PoC and measure the effectyou and Yodo